20.08.2024 Wyndham Grand Residences Batumi Gonio. Riviera Concreting of staircases in blocks A and B is underway. Ceramoblock walls are also being laid in Block B. In block C – concreting of the floor slab on the second floor. And in block E – fireplaces are being installed.