Elite Family Residence 1. Finishing work. — Painting works in units, 2nd, 5th floor. — Laying porcelain tiles on balconies and terraces. — Facing of vestibules with travertine. 2. Waterproofing works. On balconies. 3. Installation of heating radiators. 4. Installation of entrance door trims. 5. Electrical installation works. Installation of sockets and switches in the units. 6. Improvement of the territory, infrastructure. — Facing stone retaining wall. — Works on the device of a waterfall. - European Village

Elite Family Residence

1. Finishing work.
— Painting works in units, 2nd, 5th floor.
— Laying porcelain tiles on balconies and terraces.
— Facing of vestibules with travertine.

2. Waterproofing works.
On balconies.

3. Installation of heating radiators.

4. Installation of entrance door trims.

5. Electrical installation works.
Installation of sockets and switches in the units.

6. Improvement of the territory, infrastructure.
— Facing stone retaining wall.
— Works on the device of a waterfall.