Elite Family Residence 1. Finishing works. — Painting. — Puttying of walls, preparation for painting, the 4th, 5th floors. — Installation of moldings, the 2nd floor. 2. Facade works. — Cladding the facade with natural stone. 3. Plumbing. Installation of stormwater drainage system. 4. Cast-in construction for the entrance structure. - European Village

Elite Family Residence

1. Finishing works.
— Painting.
— Puttying of walls, preparation for painting, the 4th, 5th floors.
— Installation of moldings, the 2nd floor.

2. Facade works.
— Cladding the facade with natural stone.

3. Plumbing.
Installation of stormwater drainage system.

4. Cast-in construction for the entrance structure.