Elite Family Residence 1. Finishing works. — Painting, the 3rd floor. — Installation of the thresholds. — Laying of porcelain stoneware on elevator portals. 2. Installation of the canopy. 3. Installation of the firefighting system. Due to weather conditions, no other construction work is underway at the site. - European Village

Elite Family Residence

1. Finishing works.
— Painting, the 3rd floor.
— Installation of the thresholds.
— Laying of porcelain stoneware on elevator portals.

2. Installation of the canopy.

3. Installation of the firefighting system.

Due to weather conditions, no other construction work is underway at the site.