Elite Family Residence
1. Finishing works.
— Painting, the 4th floor and common areas.
— Installation of thresholds.
Laying of porcelain stoneware on elevator portals.
2. Wiring.
Mounting of luminaires.
3. Installation of drywall framing.
Due to weather conditions, no other construction work is underway at the site.