Elite Family Residence 1. Finishing works. — Painting, the 4th floor and common areas. — Puttying of walls, preparation for painting, the 5th floor. 2. Facade works. — Cladding the facade with natural stone. 3. Plastering. Plastering on the terraces. 4. Plumbing and wiring. 5. Installation of drywall framing. - European Village

Elite Family Residence

1. Finishing works.
— Painting, the 4th floor and common areas.
— Puttying of walls, preparation for painting, the 5th floor.

2. Facade works.
— Cladding the facade with natural stone.

3. Plastering.
Plastering on the terraces.

4. Plumbing and wiring.

5. Installation of drywall framing.