Elite Family Residence1. Installation of smoke extraction system. The smoke extraction system is being installed. 2. Plumbing. – Laying of heating mains in common areas. Installation of cold and hot water supply systems. – Installation of cold and hot water supply systems in the penthouses. 3. Electrical installation. Lighting wiring in common areas. 4. Laying of ceramic granite tiles in bathrooms, in units on the 3rd floor. Grouting of tiles. 5. Finishing works. – Puttying of stairs and walls of units on the 3rd floor. – Tiling with marble of inter-floor landing. – Installation of floor skirting on the 4th floor. – Installation of drywall ceilings in bathrooms of the units. 6. Facade works. Installation of decorative elements on the balcony parapets.