Wyndham Grand Batumi Gonio. Aqua
1. Facade works.
— Facade winterization, the 2nd, 4th, 5th, 7th, 11th
floors.
— Plastering of facade walls, the 2nd — 20th floors.
2. Installation of utilities systems.
— Wiring, the 17th floor.
— Installation of water supply manifolds, the 3rd — 9th floors.
3. Fabrication and installation of steel arches
Balconies on the 10th, 19th — 20th floors.
4. Ceramic block installation.
Construction with ceramic blocks, basement.
5. Installation of suspended ceilings.
Balconies on the 4th floor.
6. Drywall frame installation.
On the 17th, 19th -20th floors.