Wyndham Grand Batumi Gonio. Aqua 1. Facade works. — Facade winterization, the 3rd, 5th, 7th, 14th floors. — Plastering of facade walls, the 2nd- 20th floors. 2. Installation of utilities systems. — Hot and cold water supply risers are being installed (horizontal layout), the 12th, 13th, 18th floors. — Wiring on the balconies, the 18th floor. — Installation of the exhaust ventilation, the 16th -20th floors. 3. Fabrication and installation of steel arches Balconies on the 20th floor. 4. Suspended ceiling installation. On the balconies, the 3rd floor. 5. Waterproofing Balconies of the 4th floor. 6. Drywall frame installation. On the 3rd- 8th floors. 7. Floor screeding. On the balconies, the 3rd floor. 8. Delivery of materials. Elevator equipment was delivered. 9. Stained glass window installation. On the 3rd — 20th floors. 10. Mockup construction on the 13th floors. — Finishing works. 11. Diamond core drilling for engineering openings, the 3rd, 10th floors. Marking and drilling of precise openings for the installation of utilities in the future hotel. 12. Infrastructure building Installation and connection of power supply on the site. - European Village

Wyndham Grand Batumi Gonio. Aqua

1. Facade works.
— Facade winterization, the 3rd, 5th, 7th, 14th floors.
— Plastering of facade walls, the 2nd- 20th floors.

2. Installation of utilities systems.
— Hot and cold water supply risers are being installed (horizontal layout), the 12th, 13th, 18th floors.
— Wiring on the balconies, the 18th floor.
— Installation of the exhaust ventilation, the 16th -20th floors.

3. Fabrication and installation of steel arches
Balconies on the 20th floor.

4. Suspended ceiling installation.
On the balconies, the 3rd floor.

5. Waterproofing
Balconies of the 4th floor.

6. Drywall frame installation.
On the 3rd- 8th floors.

7. Floor screeding.
On the balconies, the 3rd floor.

8. Delivery of materials.
Elevator equipment was delivered.

9. Stained glass window installation.
On the 3rd — 20th floors.

10. Mockup construction on the 13th floors.
— Finishing works.

11. Diamond core drilling for engineering openings, the 3rd, 10th floors.
Marking and drilling of precise openings for the installation of utilities in the future hotel.

12. Infrastructure building
Installation and connection of power supply on the site.