Wyndham Grand Batumi Gonio. Aqua
1. Installation of Engineering Systems
Electrical installation work, 13th floor.
Installation of the water supply system,
2. Facade Works
Thermal insulation of balconies, 3rd, 5th, 12th floors.
3. Floor Screed Installation
On balconies,
4. Arch Sheathing
On the 19th floor.
5. Infrastructure Building
Reinforcement of the floor slab.