Wyndham Grand Batumi Gonio. Aqua 1. Installation of engineering systems. — Installation of electrical system, 11th floor. 2. Facade works. — Insulation of the facade on balconies, 5th floor. — Plastering of the facade, 8–14, floor. 3. Floor screeding works. On the 12th floor. 4. Work on the device ceiling. On the 7th floor. 5. Finishing works, 2, 3 floor. Laying ceramic tiles on the balconies. 6. Plasterboard frame installation works, 18th floor. Closing of the frame. 7. Arrangement of mocap, 3rd floor. Finishing works. 8. Works on the roof of the building. — Fabrication and installation of columns and columns. — Drilling of engineering holes. 9. Works on the device of elevator shafts. Plastering works. - European Village

Wyndham Grand Batumi Gonio. Aqua

1. Installation of engineering systems.
— Installation of electrical system, 11th floor.

2. Facade works.
— Insulation of the facade on balconies, 5th floor.
— Plastering of the facade, 8–14, floor.

3. Floor screeding works.
On the 12th floor.

4. Work on the device ceiling.
On the 7th floor.

5. Finishing works, 2, 3 floor.
Laying ceramic tiles on the balconies.

6. Plasterboard frame installation works, 18th floor.
Closing of the frame.

7. Arrangement of mocap, 3rd floor.
Finishing works.

8. Works on the roof of the building.
— Fabrication and installation of columns and columns.
— Drilling of engineering holes.

9. Works on the device of elevator shafts.
Plastering works.