Wyndham Grand Batumi Gonio. Aqua
1. Installation of engineering systems.
— Installation of electrics, 8,9 floor.
— Installation of plumbing, 19th floor.
— Installation of ventilation system, 6th floor.
2. Installation of elevator shafts.
Installation of elevator equipment.
3. Waterproofing works.
Preparatory work for the application of waterproofing on the roof of the building.
4. Arrangement of gypsum plasterboard frame.
Arrangement of the framework of partitions, sewing of columns, sewing of the ceiling.
5. Finishing works.
Laying tiles on the balconies, 20th floor.
6. Work on the roof of the building.
Priming on the roof.
7. Plastering works.
Arrangement of decorative plaster.
8. Infrastructure building.
Reinforcement of columns of the 2nd floor.