Wyndham Grand Batumi Gonio. Aqua 1. Installation of engineering systems. — Installation of electrics, 8th floor. — Installation of plumbing, 8th floor. 2. Installation of elevator shafts. Installation of elevator equipment. 3. Waterproofing works. Preparatory work for the application of waterproofing on the roof of the building. 4. Arrangement of gypsum cardboard framework. 5. Finishing works. Laying tiles on the balconies, 20th floor. 6. Plastering works. Plastering of balconies. 7. Infrastructure building. Reinforcement of walls of the 2nd floor. - European Village

Wyndham Grand Batumi Gonio. Aqua

1. Installation of engineering systems.
— Installation of electrics, 8th floor.
— Installation of plumbing, 8th floor.

2. Installation of elevator shafts.
Installation of elevator equipment.

3. Waterproofing works.
Preparatory work for the application of waterproofing on the roof of the building.

4. Arrangement of gypsum cardboard framework.

5. Finishing works.
Laying tiles on the balconies, 20th floor.

6. Plastering works.
Plastering of balconies.

7. Infrastructure building.
Reinforcement of walls of the 2nd floor.