Wyndham Grand Batumi Gonio. Aqua 1. Installation of engineering systems. Installation of power supply system, 19th, 20th floor. 2. Facade works. Plastering of the facade. 3. Plastering works. Plastering of balconies. 4. Diamond drilling of engineering holes. For the device of engineering systems. 5. Plasterboard frame installation works, 20th floor. Closure of the frame. 6. Arrangement of facade railings, 3rd floor. Drilling of holes for balusters. 7. Masonry works, 13–15 floors. Masonry doorways. 8. Infrastructure building. Dismantling of wall formwork. - European Village

Wyndham Grand Batumi Gonio. Aqua

1. Installation of engineering systems.
Installation of power supply system, 19th, 20th floor.

2. Facade works.
Plastering of the facade.

3. Plastering works.
Plastering of balconies.

4. Diamond drilling of engineering holes.
For the device of engineering systems.

5. Plasterboard frame installation works, 20th floor.
Closure of the frame.

6. Arrangement of facade railings, 3rd floor.
Drilling of holes for balusters.

7. Masonry works, 13–15 floors.
Masonry doorways.

8. Infrastructure building.
Dismantling of wall formwork.