Wyndham Grand Batumi Gonio. Aqua 1. Installation of engineering systems. — Installation of storm water drainage risers, 20th floor. — Electrical installation, 8th floor. — Plumbing installation, 11th floor. 2. Masonry works, 10th floor. Ceramoblock masonry. 3. Installation of elevator shafts. 4. finishing works, 20th floor. Laying tiles on the balconies. 5. Waterproofing works. — Preparatory work for the application of waterproofing on the roof of the building. 6. Arrangement of gypsum cardboard framework. Closing of columns. 7. Infrastructure building. Installation of floor slab formwork and reinforcement of the 1st floor slab. - European Village

Wyndham Grand Batumi Gonio. Aqua

1. Installation of engineering systems.
— Installation of storm water drainage risers, 20th floor.
— Electrical installation, 8th floor.
— Plumbing installation, 11th floor.

2. Masonry works, 10th floor.
Ceramoblock masonry.

3. Installation of elevator shafts.

4. finishing works, 20th floor.
Laying tiles on the balconies.

5. Waterproofing works.
— Preparatory work for the application of waterproofing on the roof of the building.

6. Arrangement of gypsum cardboard framework.
Closing of columns.

7. Infrastructure building.
Installation of floor slab formwork and reinforcement of the 1st floor slab.