Wyndham Grand Batumi Gonio. Aqua 1. Installation of utilities systems. — Wiring, the 19th floor. — Installation of water supply system, the 16th -15th floors. — Installation of exhaust ventilation system risers, the 8th- 9th floors. 2. Welding. The installation of steel arches is being completed, the 19th floor. 3. Floor screeding. — On the balconies, the 18th floor. 4. Insulation, the 18th floor. Waterproofing of stained glass windows joints. 5. Installation of the elevator shafts. 6. Diamond drilling of the engineering openings, the 12th- 14th floors. Marking and drilling is carried out, which is necessary for the installation of engineering systems of the future hotel. 7. Infrastructure building. Ongoing pit excavation. - European Village

Wyndham Grand Batumi Gonio. Aqua

1. Installation of utilities systems.
— Wiring, the 19th floor.
— Installation of water supply system, the 16th -15th floors.
— Installation of exhaust ventilation system risers, the 8th- 9th floors.

2. Welding.
The installation of steel arches is being completed, the 19th floor.

3. Floor screeding.
— On the balconies, the 18th floor.

4. Insulation, the 18th floor.
Waterproofing of stained glass windows joints.

5. Installation of the elevator shafts.

6. Diamond drilling of the engineering openings, the 12th- 14th floors.
Marking and drilling is carried out, which is necessary for the installation of engineering systems of the future hotel.

7. Infrastructure building.
Ongoing pit excavation.