Wyndham Grand Batumi Gonio. Family Club. Block A 1. Facade arrangement. — Works on facade insulation and partition walls on balconies. — Plastering of the facade. 2. Installation of monolithic belt on the roof parapet. 3. Arrangement of elevator shafts. — Installation of reinforced concrete portals in elevator shafts. — Plastering of elevator portals. 4. Plastering works. Plastering of internal walls, 3, 5 floors. 5. Plasterboard frame installation works. Arrangement of guide frames of partitions. 6. Arrangement of storm water drainage. Installation of storm water drainage drains. 7. Welding works. Fabrication of metal arches. Block B 1. Plastering works. Plastering of internal walls, 2nd floor. 2. Masonry works, 5th floor. Block masonry in ventilation shafts. - European Village

Wyndham Grand Batumi Gonio. Family Club.

Block A
1. Facade arrangement.
— Works on facade insulation and partition walls on balconies.
— Plastering of the facade.

2. Installation of monolithic belt on the roof parapet.

3. Arrangement of elevator shafts.
— Installation of reinforced concrete portals in elevator shafts.
— Plastering of elevator portals.

4. Plastering works.
Plastering of internal walls, 3, 5 floors.

5. Plasterboard frame installation works.
Arrangement of guide frames of partitions.

6. Arrangement of storm water drainage.
Installation of storm water drainage drains.

7. Welding works.
Fabrication of metal arches.

Block B
1. Plastering works.
Plastering of internal walls, 2nd floor.

2. Masonry works, 5th floor.
Block masonry in ventilation shafts.