Wyndham Grand Batumi Gonio. Family Club Block A 1. Plastering Works Plastering of interior walls, 3rd floor. Plastering in ventilation shafts, on the roof. 2. Installation of Glazing Structures Installation of stained-glass windows. 3. Glazing Installation Installation of stained-glass windows and glass panels. 4. Waterproofing Works Preparation for waterproofing balconies, application of coating waterproofing. 5. Installation of Monolithic Belt on the Roof Parapet. 6. Installation of Drywall Frame Installation of guiding frames for drywall partitions. Block B 1. Diamond Drilling of Engineering Openings For stormwater drainage system installation. 2. Plastering Works Plastering of interior walls, 2nd floor. 3. Masonry Works Masonry of blocks in ventilation shafts. - European Village

Wyndham Grand Batumi Gonio. Family Club

Block A
1. Plastering Works
Plastering of interior walls, 3rd floor.
Plastering in ventilation shafts, on the roof.

2. Installation of Glazing Structures
Installation of stained-glass windows.

3. Glazing Installation
Installation of stained-glass windows and glass panels.

4. Waterproofing Works
Preparation for waterproofing balconies, application of coating waterproofing.

5. Installation of Monolithic Belt on the Roof Parapet.

6. Installation of Drywall Frame
Installation of guiding frames for drywall partitions.

Block B
1. Diamond Drilling of Engineering Openings
For stormwater drainage system installation.

2. Plastering Works
Plastering of interior walls, 2nd floor.

3. Masonry Works
Masonry of blocks in ventilation shafts.