Wyndham Grand Batumi Gonio. Family Club.
Block A
1. Plastering works.
— Plastering of walls, 2, 5 floors.
— Plastering of slopes, 4th floor.
— Plastering of ventilation shafts on the roof.
2. Arrangement of gypsum plasterboard frame.
Installation of reinforced profiles in GKL partitions.
3. Arrangement of arches.
Manufacturing and installation of metal structures on the arches of balconies.
4. Arrangement of storm water drainage.
Arrangement of storm water drainage outlets on the facade.
Landscaping of the territory.
1. Fence installation
Fence masonry.