Wyndham Grand Batumi Gonio. Family Club.Building A 1. Facade works. – Facade plastering. 2. Finishing works. Plastering of inner walls, on the 4th floor. 3. Drywall frame installation, on the 4th floor. 4. Ceramic block installation. Ceramic blocks are being installed on the roof. 5. Construction of cast-in ledges for the stained glass installation. Building B. 1.The masonry works, the 4th floor. The ceramic blocks are being installed. 2. The beam reinforcement.