Wyndham Grand Batumi Gonio. Family Club. Building A 1. Installation of cast-in ledges on the balconies. — The formwork installation for the balcony ledges. 2. Plastering on the 1st- 4th floors. Plastering of inner walls. 3. Plumbing. Installation of stormwater drainage system on the balconies. 4. Facade works. The façade is getting ready for winterization and mineral wool installation. Building B. 1. Masonry works, the 3rd floor. Ceramic block installation. - European Village

Wyndham Grand Batumi Gonio. Family Club.

Building A
1. Installation of cast-in ledges on the balconies.
— The formwork installation for the balcony ledges.

2. Plastering on the 1st- 4th floors.
Plastering of inner walls.

3. Plumbing.
Installation of stormwater drainage system on the balconies.

4. Facade works.
The façade is getting ready for winterization and mineral wool installation.

Building B.
1. Masonry works, the 3rd floor.
Ceramic block installation.