Wyndham Grand Batumi Gonio. Family Club.

Building A
1. Installation of cast-in ledges on the balconies.
The ledges are being formworked and reinforced for stained glass windows to be installed.

2. Plastering, the 1st floor.

3. Installation of drywall frames, the 1st floor.
Installation of guides for drywall partition frames.

Building B.
1. Masonry work.
Ceramic block installation on the 4th floor and roof.

2. Formwork removal from the slab.
On the 5th floor.