Wyndham Grand Batumi Gonio. Riviera. 1. Block A. Installation of engineering systems. — Electrical installation works. — Installation of air-conditioning system. — Hot and cold water supply system. 2 Block B. Screeding. Pouring of screed on terraces. 3. Block E. Installation of engineering systems. — Electrical installation works. — Installation of air-conditioning system. 4. Fabrication and installation of storm water drainage boxes. 4. 5. Infrastructure building. Screeding of the stairwell. - European Village

Wyndham Grand Batumi Gonio. Riviera.

1. Block A. Installation of engineering systems.
— Electrical installation works.
— Installation of air-conditioning system.
— Hot and cold water supply system.

2 Block B. Screeding.
Pouring of screed on terraces.

3. Block E. Installation of engineering systems.
— Electrical installation works.
— Installation of air-conditioning system.

4. Fabrication and installation of storm water drainage boxes. 4.

5. Infrastructure building.
Screeding of the stairwell.