Wyndham Grand Batumi Gonio. Riviera 1. Block B. Plastering Works Plastering of interior walls. 2. Block A. Mock-up Works Electrical installation. 3. Block A. Installation of Engineering Systems Completion of sewage and ventilation system installation. 4. Block E. Installation of Glazing Structures Slope finishing and stained-glass installation. 5. Block A. Installation of Glazing and Glass Panels. 6. Block A. Floor Screed Installation on Terraces Screed pouring. 7. Block A. Waterproofing Installation Works on balconies. 8. Block B. Installation of Drywall Frame Installation of guiding frames for drywall partitions. 9. Block B. Fireplace Installation Chimney installation. - European Village

Wyndham Grand Batumi Gonio. Riviera

1. Block B. Plastering Works
Plastering of interior walls.

2. Block A. Mock-up Works
Electrical installation.

3. Block A. Installation of Engineering Systems
Completion of sewage and ventilation system installation.

4. Block E. Installation of Glazing Structures
Slope finishing and stained-glass installation.

5. Block A. Installation of Glazing and Glass Panels.

6. Block A. Floor Screed Installation on Terraces
Screed pouring.

7. Block A. Waterproofing Installation
Works on balconies.

8. Block B. Installation of Drywall Frame
Installation of guiding frames for drywall partitions.

9. Block B. Fireplace Installation
Chimney installation.