Wyndham Grand Batumi Gonio. Riviera. 1. Block C. Formwork removal from and installation for the stair flights It ensures precise shape and geometry of the staircase, supports the concrete during curing, and guarantees surface quality and structural safety. 2. Blocks A, E. Waterproofing of the terraces. 3. Block A. Mockup installation completed. – Utilities system installation, namely: sewage, heating, and water supply. – Inner communication system is being installed. – Electrical installation. 4. Block E. Facade works. Facade plastering. 5. Blocks A, B, C, E. Roofing. The insulation is being installed. 6. Infrastructure building. – Ceramic blocks installation on the 1st floor 7. Block E. Drywall frame installation.