Wyndham Grand Batumi Gonio. Riviera.1. Ceramic block installation. Block C on the 2nd and 3rd floors. The ceramic blocks are being laid in accordance with the established standards. This process ensures that the walls are level and vertically aligned. All joints and angles are checked to meet the project specifications. 2. Formwork installation and removal from the staircases, reinforcement and pouring. It is necessary to create the precise shape and geometry of the staircase, support the concrete until it hardens, and ensure surface quality and structural safety. 3. Block B. Installation of ledges for stained glass, the 3rd floor. The formwork is installed, the concrete is poured, and compacted. After the concrete hardens, the formwork is removed, and the stained glass windows are installed.