Wyndham Grand Batumi Gonio. Riviera. 1. Plastering. — Plastering of inner walls in Block C. 2. Block B. Ongoing formwork installation for staircases. It helps to create the exact shape and geometry of the staircase, to maintain the concrete until it hardens, to ensure surface quality and structural safety. 3. Block A. Installation of insulation system on the terraces. Screeding on the terrace of the 3rd floor. 4. Block A. Waterproofing On the 3rd floor. 5. Block E. Drywall frame installation. Installation of guides for drywall partition frames. 6. Block A. Installation of steel chimney framing on the terrace. - European Village

Wyndham Grand Batumi Gonio. Riviera.

1. Plastering.
— Plastering of inner walls in Block C.

2. Block B. Ongoing formwork installation for staircases.
It helps to create the exact shape and geometry of the staircase, to maintain the concrete until it hardens, to ensure surface quality and structural safety.

3. Block A. Installation of insulation system on the terraces.
Screeding on the terrace of the 3rd floor.

4. Block A. Waterproofing
On the 3rd floor.

5. Block E. Drywall frame installation.
Installation of guides for drywall partition frames.

6. Block A. Installation of steel chimney framing on the terrace.