Wyndham Grand Batumi Gonio. Villas.

1. Formwork removal from the slab, Villa 11.
The formwork is stripped off after concrete hardening to complete the structure and prepare for the next construction stage.

2. Installation of reinforcement frames for columns, Villas 14 and 16.
It ensures the strength and stability of the columns, preventing deformation and enhancing the durability of the structure.

3. Installation of slab formwork, Villa 13.
Formwork is installed to create the shape required for concrete pouring and structural formation.