Wyndham Grand Batumi Gonio. Villas.1. Concrete pouring of floor slabs, Villas 7-9. It is necessary to increase the strength and stability of the structure. 2. Concrete pouring of the floor slab, Villa 16. It creates a strong and level base for future floors, providing the required rigidity and load resistance. 3. Waterproofing of external foundation walls, Villas 12, 15. It prevents moisture penetration into the foundation and ensures its protection. 4. Start of external wall insulation, Villas 12, 15. It is necessary to enhance the energy efficiency of the building. 5. Continuation of the assembly of the reinforced concrete frame of columns, Villas 11-13.