Wyndham Grand Batumi Gonio. Villas. 1. Dismantling of column formwork, Villa 2, 4, 5. Removal of formwork after concrete hardening to complete the structure and prepare for the next construction phase. 2. Reinforcement of columns, Villa 1. It ensures the strength and stability of the columns, preventing deformation and increasing the building’s durability. 3. Reinforcement of the floor slab, Villa 3. It enhances structural strength and stability, increasing the building’s durability. 4. Installation of safety bars for the floor slabs, Villa 16. 5. Construction of the fence. Formwork removal from the fence lintel and post. - European Village

Wyndham Grand Batumi Gonio. Villas.

1. Dismantling of column formwork, Villa 2, 4, 5.
Removal of formwork after concrete hardening to complete the structure and prepare for the next construction phase.

2. Reinforcement of columns, Villa 1.
It ensures the strength and stability of the columns, preventing deformation and increasing the building’s durability.

3. Reinforcement of the floor slab, Villa 3.
It enhances structural strength and stability, increasing the building’s durability.

4. Installation of safety bars for the floor slabs, Villa 16.

5. Construction of the fence.
Formwork removal from the fence lintel and post.