Wyndham Grand Batumi Gonio. Villas.
1. Formwork Removal for Floor Slabs (2nd Floor), Villas 14, 16
After concrete has hardened it is required to remove the formwork to complete the structure and prepare for the next stage of construction.
2. Formwork Installation for Floor Slabs (2nd Floor), Villa 4.
Installation of formwork to create the necessary shape for concrete pouring and structural formation.
3. Formwork Installation for Columns (2nd Floor), Villas 1, 6, 7.
Installation of formwork to shape the columns, essential for concrete pouring and structural formation.
4. Installation of Reinforcement Cages for Columns (2nd Floor), Villa 8