Wyndham Grand Batumi Gonio. Villas.

1. Formwork removal from the floor slab, Villa 11.
Removal of the formwork after the concrete has cured to complete the structure and prepare for the next stage of construction.

2. Formwork removal from the columns, Villa 13.
Removal of the formwork after the concrete has cured to complete the structure and prepare for the next stage of construction.

3. Installation of the railings, Villa 11.
Installation of slab guardrails.

4. Fencing.