Wyndham Grand Batumi Gonio. Villas.
1. Masonry works, villa 2, 4.
Ceramoblock masonry of external walls.
2. Works on dismantling of formwork
— floor slab II floor, villa 6,
— columns II floor, villas 10, 11.
Removal of formwork after concrete curing to complete the structure and prepare for the next phase of construction.
3. Installation of reinforcement frames
— Installation of column frames of II floor columns, villa 12.
— Fabrication of II floor column frames, villa 13, 14.
3. Fabrication of embedded parts.