11.07.2024 Wyndham Grand Residences Batumi Gonio. Riviera The following works are in progress: - in Block A - laying of ceramic block walls on the 3rd floor; - in Block E - installation of staircase formwork; - in the infrastructure building - reinforcement of the floor slab. - European Village

11.07.2024 Wyndham Grand Residences Batumi Gonio. Riviera The following works are in progress: – in Block A – laying of ceramic block walls on the 3rd floor; – in Block E – installation of staircase formwork; – in the infrastructure building – reinforcement of the floor slab.