17.09.2024 Wyndham Grand Residences Batumi Gonio. Riviera In Block A, fireplaces are being laid, the monolith of the staircases is being poured and the formwork on the terrace is being installed. In Block B – monolith pouring of the parapet top, monolith pouring along the parapet, laying of ceramic block (first floor), laying of fireplaces and concreting of staircases. In Block C – pouring of slab monolith and construction of fences.