22.09.2024 Wyndham Grand Residences Batumi Gonio. Riviera In Block A, fireplaces are being laid and formwork is being installed on the terrace. In Block B - pouring of monolith on the parapet, laying of ceramic block (first floor), installation of staircase formwork. In Block C - installation of safety fences. - European Village

22.09.2024 Wyndham Grand Residences Batumi Gonio. Riviera In Block A, fireplaces are being laid and formwork is being installed on the terrace. In Block B – pouring of monolith on the parapet, laying of ceramic block (first floor), installation of staircase formwork. In Block C – installation of safety fences.