Wyndham Grand Batumi Gonio. Aqua Installation of stained glass windows, preparation of stained glass waterproofing and vapour barrier. Installation of decorative boxes on balconies, dusting of ceilings, geodesic works, anti-corrosion works (metal painting), lifting of building materials to the floors, arrangement of lift shaft coverings (preparation for installation of lift equipment), diamond drilling of engineering holes, plastering of openings. On the 12th floor the installation of plasterboard frame of internal partitions is in progress.