Elite Family Residence 1. Laying of porcelain tiles, units on the 1st, 2nd and 4th residential floor Leveling of the surface and laying of tiles with respect to joints and necessary techniques to ensure the strength and durability of the coating. 2. Facing of staircases with marble Includes preparation of the base, laying of slabs on glue with regard to markings and joints. 3. Finishing of the west façade and installation of decorative elements on the east façade Installation of decorative elements to create an aesthetic and protected appearance of the building. 4. Installation of gypsum plasterboard framework in the bathrooms, soffits Metal fencing and plumbing works in the penthouses are also in progress.