17.01.2024 Wyndham Grand Residences Batumi Gonio. Aqua Reinforcement of the floor slab is underway on the 20th construction (19th hotel) floor. Wall masonry work continues on the 13th (12th) floor. - European Village

17.01.2024 Wyndham Grand Residences Batumi Gonio. Aqua Reinforcement of the floor slab is underway on the 20th construction (19th hotel) floor. Wall masonry work continues on the 13th (12th) floor.