05.03.2024 Wyndham Grand Residences Batumi Gonio. Riviera Dismantling of the floor slab formwork is underway in Block A. In Block B, installation of the foundation slab formwork. In Block C, earthworks. In Block E - laying of walls with ceramic block and installation of staircase formwork. - European Village

05.03.2024 Wyndham Grand Residences Batumi Gonio. Riviera Dismantling of the floor slab formwork is underway in Block A. In Block B, installation of the foundation slab formwork. In Block C, earthworks. In Block E – laying of walls with ceramic block and installation of staircase formwork.