08.07.2024 Wyndham Grand Residences Batumi Gonio. Riviera On the 3rd floor of block A the walls are being laid with ceramic block. Concreting of the floor slab has taken place in Block B. Fireplaces are being installed in Block E. In the infrastructure building the floor slab formwork is being assembled.