01.05.2024 Wyndham Grand Residences Batumi Gonio. Aqua On the 2nd construction (1 hotel) floor, measurements for the installation of stained glass windows have begun. On the 19th (18th) floor, loading of building materials and laying of walls with ceramic block continues. A capital fence is under construction on the property.