01.05.2024 Wyndham Grand Residences Batumi Gonio. Family Club In Block A, the installation of the floor slab formwork and the laying of walls with ceramic block continue. In Block B, dismantling and erection of column formwork is underway. - European Village

01.05.2024 Wyndham Grand Residences Batumi Gonio. Family Club In Block A, the installation of the floor slab formwork and the laying of walls with ceramic block continue. In Block B, dismantling and erection of column formwork is underway.