03.05.2024 Wyndham Grand Residences Batumi Gonio. Riviera Ceramoblock is being loaded onto the floors and walls are being laid on the 2nd floor in Block A. Ballast is being backfilled in Block B. Foundation reinforcement continues in Block C.