04.05.2024 Wyndham Grand Residences Batumi Gonio. Family Club On the 1st floor of the block A, the laying of walls with ceramic block continues, above the 5th floor the installation of the formwork of the floor slab is in progress. In Block B, the floor slab formwork is being erected.