04.06.2024 Wyndham Grand Residences Batumi Gonio. Riviera Wall masonry with ceramic block is underway in Block A. Concreting of the floor slab and columns has been carried out in Block B. Installation of retaining wall formwork continues in Block C. Staircase reinforcement is being carried out in the infrastructure building.