06.06.2024 Wyndham Grand Residences Batumi Gonio. Riviera On the 2nd floor of block A the walls are being laid with ceramic block. On the 1st floor of Block B, the floor slab formwork is being assembled. In Block C, the installation of the retaining wall formwork is in progress.