09.05.2024 Wyndham Grand Residences Batumi Gonio. Riviera In Block A on the second floor, masonry walls continue to be laid with ceramic block. Concreting of the floor slab has taken place in Block B. Reinforcement of the floor slab is underway in the infrastructure building.