10.05.2024 Wyndham Grand Residences Batumi Gonio. Riviera In Block A on the second floor, masonry walls continue to be laid with ceramic block. In Block B, reinforcement and formwork installation of the floor slab is underway. Reinforcement of the floor slab is underway in the infrastructure building.