13.05.2024 Wyndham Grand Residences Batumi Gonio. Riviera On the 2nd floor of Block A, masonry walls continue to be laid with ceramic block. In Block B, reinforcement and formwork installation of the floor slab is underway. Column reinforcement is being carried out in the infrastructure building.